Surgical simulation training

Project type
Design for Manufacturing and New Product Introduction for a fully outsourced supply chain solution

Client
This customer is an established company that develops and markets its own range of surgical simulation training systems.

Client Brief
The company came to Gentian with a working prototype for a new revision of its product.

Our role was to:

  • Finalise the design of the product, ensuring suitability for manufacturing
  • Put in place the appropriate outsourced supply chain and manufacturing solution
  • Manage the NPI process through to steady state manufacturing

Gentians Solutions
This was a comprehensive project going from the design stage straight through to full manufacturing.

Gentian fulfilled the brief by:

  • Implementing a fully project-managed solution for the NPI stage of the project, taking full responsibility for all aspects of the project
  • Providing full Design for Manufacturing Engineering services to ensure that the product was both manufacturable and reliable
  • Supplying design for compliance services where the design was analysed and revised to ensure compliance with the UL standard for laboratory equipment
  • Managing the complete compliance process on behalf of the client and coordinating all testing and approval activities
  • Sourcing, auditing and qualifying the appropriate supply base for the product subassemblies, which included plastics, metal fabrication and various electronic components
  • Providing a turnkey supply and configuration solution that involved supply chain management of all subassemblies with final assembly, configuration and testing performed on-site at Gentian

Gentian Skillsets Deployed

  • System design engineering
  • Manufacturing engineering
  • Supply chain development and management
  • Sourcing and procurement
  • Low volume manufacturing
  • Compliance engineering
  • Test engineering
  • Program management

Results

  • New product was launched three months earlier than planned, pulling in significant revenue
  • Standard product lead time was reduced from 10 weeks to 6 weeks
  • Manufactured cost of product decreased by 12%
  • Overhead costs to the client were lowered substantially
  • Gentian’s full turnkey service released internal resources for the client
  • Client inventory liability decreased by 50%

Gentian has been a strategic partner for over 2 years: this has enabled us to focus on core activities while knowing that our supply chain and manufacturing activities are in safe and competent hands. By involving Gentian in development stages, we have been able to maximise productivity and profitability on key projects as well as controlling costs and inventory of manufactured products. Gentian’s expertise has earned our confidence; their flexibility and understanding of end-customer needs makes them great people to do business with.

- Fiona Slevin. CEO Haptica Ltd